Timeline
1998
- Thorsys relocated its support office to Brisbane, Queensland.
- In conjunction with Amcor Fibre Packaging, Thorsys developed and installed a carton order, forming and delivery system with realtime video and computer overlays.
- Nolan Meats (Gympie, Queensland) issued a requirement for a full abattoir system (including livestock, specifications, stock, orders, slaughter, carton weighing, loadout, distribution) to which Thorsys tendered, and subsequently received the contract.
- Thorsys contracts 2 people to IBM, on the Year 2000 Compliance testing at Optus and Telstra.
- Thorsys developed a Livestock module integrated into the standard suite of programs.
- Swan Hill abattoir (Victoria) issued a requirement for a full abattoir system (including livestock, specifications, stock, orders, slaughter, carcass loadout, distribution, skins and hides) to which Thorsys tendered, and subsequently received the contract.
- Thorsys takes over all aspects of Ausmeat software, including Abcost, Abtag, Amis, existing customer sites, and copyright.
- Q Meat issued a requirement for the replacement of their Beef and Smallstock lines at both Cannon Hill and Ipswich, to which Thorsys tendered, and subsequently received the contract.
- Thorsys integrates into the Viascan suite of systems.
Return back to timelines listings